Ensure that you are able to safely and easily run power to your office equipment, when and where you need it, with this 72” single circuit whip with 3 prong plug. Not only will this 72” whip provide a safe way to power your equipment, but it will also work well to stabilize the energy flow, so that you are not exposing your sensitive machines to the potential of power surges. This is both a cost effective and safety conscious way to ensure that you are setting up your office the right way.
HOW TO ORDER: (1) Determine the configurations that need powered and electrical load requirements. (2) Choose base feed. (3) Establish placement of power blocks. (4) Identify receptacles per power block. (5) To figure harness length, take the center of the item where the power blocks are to be placed, plus the length of any items the harness needs to pass under; subtract 8” and use the next larger size harness, unless measurement is exactly the size of a harness. For example: Sample #1 the power blocks are centered in the 42” returns, so half the return size is 21” for each return (21” + 21”) plus 3” depth of the peninsula, minus 8”. (21” + 21” + 3” – 8” = 64” harness length). (6) Determine needed accessories.